Year | Description |
---|---|
2005 | Dubai Palace RO Water PLC & SCADA |
2007 | OYL Group Air cond PLC & SCADA QC Line B1 |
2011 | OYL Group Air cond PLC & SCADA QC Line B2 |
2012 | Top Glove PLC & SCADA Lines at Dengkil Plant |
2013 | Kapar Energy Venture Power plant PLC System Upgrade |
2014 | Amman Jaya Calcium Carbonate Plant’s PLC System |
2015 | Daikin Water Chiller Cooling PLC & SCADA |
2015 | Sunway BRT Prasarana’s Bus Wireless System |
2016 | Frimec Manufacturing Aircond QC SCADA and PLC System |
2016-2017 | Daikin Line B3 and E3 SCADA and PLC |
2017 | Filtermation Production Monitoring SCADA and PLC System |
2017 | Daikin VRV Line SCADA and PLC |
2018 | Daikin QC Vision Inspection System |
Year | Description |
---|---|
1999 | To design and develop the refurbished steel apron drive PLB’s PLC program for hydraulic drive and lifting at Labuan Airport. Total: 3 Nos. |
2000 | To design and develop the refurbished steel apron drive PLB’s program for hydraulic drive and lifting at Sandakan Airport. Total: 2 Nos. |
2001 | To design and develop the VDGS PLC program at Kota Bahru Airport. Total: 3 Nos. |
2002 | To design and develop the glass wall apron drive PLB’s and VDGS PLC program for hydraulic drive and lifting at Bintulu Airport. Total: 2 Nos. |
2003 | To design and develop the glass wall apron drive PLB’s and Nose Loader PLC program for hydraulic drive and lifting at Miri Airport. Total: 1 Nos. Apron Drive and 2 Nos. Nose Loader. |
2004 | To design and develop the glass wall apron drive PLB’s and VDGS PLC program for hydraulic drive and lifting at Alor Setar Airport. Total: 2 Nos. |
2005 | To design and develop the A380 glass wall apron drive PLB’s PLC program for hydraulic drive and lifting at Kuala Lumpur International Airport. Total: 3 Nos. |
2006 | To design and develop the glass wall apron drive PLB’s PLC program for hydraulic drive and lifting at Nadi International Airport (FIJI). Total: 2 Nos. |
2007 | To design and develop glass wall apron drive PLB’s PLC program for hydraulic drive and lifting at Kota Kinabalu International Airport. Total: 12 Nos. |
2008 | To design and develop the A380 Apron Services Management System (ASMS) PLC and SCADA program at Kuala Lumpur International Airport. |
2009 | To design and develop the KLIA Apron Services Management System (ASMS) PLC and SCADA program at Kuala Lumpur International Airport. Total gates: 46 Nos. |
2010 | To design & develop Baggage Handling Conveyor System interfaces for A380’s new carousel system at Kuala Lumpur International Airport A380’s arrival hall. |
2014 | To provide 4 years Non-Comprehensive Maintenance Services for KLIA Apron Services Management System (ASMS) |
2015 | To upgrade the existing KLIA Apron Services Management System (ASMS) hardware & system enhancements |
2016 | To develop an enhanced monitoring system for the existing power meters at Kuala Lumpur International Airport LV substations 2017 |
2017 | To enhance energy saving by adding an auto-timer cutoff for GPU during standby when not in use |
2017 | To supply, deliver and install exhaust fan with temperature controller for ventilation at hammerhead room |
2018 | Upgrading and enhancement of Apron Services Management System (ASMS) at KLIA, expansion of ASMS to klia2 and installation of power meter complete with integration to ASMS for predictive maintenance for Passenger Boarding Bridge |
2019 | Supply, deliver, install, configure, training, testing, commissioning and associated works of supervisory, control and data acquisition (SCADA) for electrical sub-stations at KL International Airport and KLIA2. |